limilt

Boulter Camry 2 Boiler Manuals

Toyota Camry 2.2gx

Boulter Camray 5 Oil Boiler Manual Boiler Manuals for the Worcester Camray 5 65/90 Utility System appliance. View Manual pdf download 1.12 Mb. Discuss Camray 3 Oil Boiler Manual. In the Oil and Solid Fuel Forum area at UKPlumbersForums.co.uk. Boulter camray 3 manual, camray 2 boiler.

• Page 1 of 77 COMBI OPERATING, INSTALLATION & MAINTENANCE MANUAL CAMRAY 5 COMBI Oil Fired Boilers (55, 70A & 90A) Manual Part No PL50000 Issue No. 5 Date of Issue February 2003 HEALTH AND SAFETY INFORMATION FOR THE INSTALLER AND SERVICE ENGINEER. • 30 White House Road, Ipswich IP1 5JA Telephone: (01473) 241555 Boulter Boilers Fax: (01473) 241321 A subsidiary of Buderus Heiztechnik GmbH Due to a policy of continual development reserves the right to alter or amend the design of its products without prior notice.

• Page 3 of 77 1:1 Introduction 1:2 Useful Information 1:3 Important Safety Notes 1:4 Connections 1:5 Installation and Commissioning 1:6 Boiler Control Panel 1:7 Operating Features and Instructions 1:8 Maintenance 1:9 Failure to Start SECTION 2 - INTRODUCTION 2:1 Introduction 2:2 Hydraulic Circuits 2:3 Flue Options 2:4 Commissioning. • CAMRAY 5 COMBI PAGE 1 1:1 INTRODUCTION Thank you for choosing the Camray Combi manufactured in the UK by Boulter Buderus who are renowned oil-firing specialists. To obtain the best possible performance and trouble free operation from your Boiler, it is important that you read section 1 of this manual carefully.

• Information can be found on appliance data label located inside the left hand side panel of the casing. Also on the front cover of your installation manual. CAMRAY 5 COMBI PAGE 2 1:3 IMPORTANT SAFETY NOTES To obtain the best possible performance and trouble free operation from your Boiler, it is important that you read these instructions carefully. • O. Tikka Serial Number Year Winchester here. F.T.E.C.* registered engineer.

It is the responsibility of the installer to ensure that the Boiler is commissioned. If an engineer is not known, Boulter Buderus will be pleased to provide details of a commissioning and servicing engineer from their register. • If this temperature is likely to cause nuisance or discomfort your installer should be able to advise on a suitable temperature blending valve. CAMRAY 5 COMBI PAGE 3 1:6 BOILER CONTROL PANEL Boiler Control Panel (see 1. Lf the burner locks out again wait 3 minutes and repeat the operation again.

If the problem occurs again, turn the boiler off and consult your installer. CAMRAY 5 COMBI PAGE 4 file://D: PL50000 PL50000.htm. • Page 9 of 77 Fig. 1b Lockout Reset 1:7 OPERATING FEATURES AND INSTRUCTIONS 1:7.1 How does your boiler work? Hot Water 1 If the Programmer is set for Hot Water only or the Summer/Winter switch is set to Summer:- a) The boiler will operate until the hot water tank reaches the temperature you have set on the Hot Water Tank Thermostat. • Control Panel, or the programmer switch to the OFF position on the optional programmer. 1:7.3 Sealed System Central Heating Your Camray 5 COMBI Boiler may only be used on a SEALED SYSTEM.

It is important that the correct operating system pressure is maintained. If the System Pressure Gauge, in the Control Panel, should indicate low pressure i.e. • CAMRAY Boilers offer greater freedom to select the most suitable position for siting and the opportunity to install the boiler in a suitable outbuilding if required.

All models are supplied for connection to a conventional chimney or any of the available Camray 5 Combi Balanced Flue options. • Page 12 of 77 Fig. 2a Schematic Diagram Camray 5 Combi CAMRAY 5 COMBI PAGE 7 2:2 HYDRAULIC CIRCUITS file://D: PL50000 PL50000.htm. • Page 13 of 77 Fig. 2b Hydraulic Circuits 2:3 FLUE OPTIONS CAMRAY Boilers are designed to operate with high efficiency, clean combustion and low noise level.